Verified Capacity

Shoevel-ready power delivery

18 Mos

deployment timeline

500 MW

pipeline capacity

100%

fiber proximity

Bypassing Bottlenecks

Engineered power solutions

Bitcoin site conversion

Stranded gas generation

Inference-first site design

We acquire pre-zoned, high-voltage cryptocurrency mining facilities and rapidly upgrade their electrical infrastructure to support high-density AI inference clusters.

Where local utility grids face multi-year delays, we deploy on-site natural gas generators powered by otherwise stranded wellhead gas for immediate off-grid power.

We lay out parcels specifically for AI workloads, optimizing spacing for immediate connection to ultra-high-capacity fiber backbones and heavy utility substations.

Secure shovel-ready megawatts

Partner with Landcor to bypass traditional grid bottlenecks. Request detailed site briefs for our active, permitted pipeline across the United States.